1WorldSync will utilize the maintenance window for Item Management (IM), Product Introduction (PI/VIP), Digital Catalog (DC), and Content1 (C1) Saturday, November 11, 2022, for the Production environment.
Sat, November 19, 2022, 9 am - 4 pm* ET
This is an extended maintenance window
- Item Management
- Product Introduction
- Digital Catalog
- Content1